Got the sheetrock hung today (the bottom is plywood for the beadboard to be nailed to).
Saturday, March 12, 2011
Monday, March 7, 2011
Bathroom - Insulation
Wednesday, March 2, 2011
Bathroom - Plumbing and Electrical
Electrician finished the rough-in for outlets, sconces, exhaust fan, and overhead light. The plumber has the drain and vent all finished and the water lines are roughed-in. Still waiting for a pressure balancer for the shower, once that is in the plumber will connect the water lines.
Framing for the medicine cabinet and sconces roughed-in next to it.
Subscribe to:
Posts (Atom)