Search This Blog

Saturday, March 12, 2011

Sheetrock

Got the sheetrock hung today (the bottom is plywood for the beadboard to be nailed to).











Monday, March 7, 2011

Bathroom - Insulation

The insulators spray-foamed the bathroom this morning. It's been about five weeks since I demo'd the room and removed all the insulation, it was nice today to come home and not feel drafts.

Here's a couple of the before:









Insulated walls and ceiling:














Here's some before pictures of the cellar ceiling before insulation:









Insulation ceiling:




Wednesday, March 2, 2011

Bathroom - Plumbing and Electrical

Electrician finished the rough-in for outlets, sconces, exhaust fan, and overhead light. The plumber has the drain and vent all finished and the water lines are roughed-in. Still waiting for a pressure balancer for the shower, once that is in the plumber will connect the water lines.
Framing for the medicine cabinet and sconces roughed-in next to it.

Vent stack, overhead light, and exhaust fan.



Future throne



This is the spaghetti mess that has become our cellar.


Next step is to have the framing inspected and then hopefully Friday the room will be insulated. Then a insulation inspection and we can start sheetrock.