Now I just have to putty some cracks and prime and paint. Wish I has time to pull and restore windows.
Tuesday, July 30, 2013
Sloanes new room
Parents came today to remove wallpaper from sloanes new room. Push is on to get her into the room and settled in before baby comes in oct.
Thursday, July 25, 2013
Tuesday, July 23, 2013
Basement sewer lines
Now that the upstairs bathroom mess is contained it's time to start a new mess in the basement. Jackhammered a channel in the basement floor so the plumbers can replace the cast iron sewer lines with PVC, add a back flow valve, add a vent stack for the basement bathroom/washer/utility sink, and a washer box.
This wasn't nearly as bad as I expected. Took morning to jackhammer and afternoon to haul out concrete chunks in pails.
Utility sink now emptys into a vented drain (before it flowed uphill into the main cleanout) and the washer will also have its own vented drain. Everything passed city inspection.
Friday, July 19, 2013
Upstairs bathroom demo
Took majority of day to get window, sills, and door casing stripped today. As always way longer than I expected. White, pink, and green layers. If it stops raining demo will start tonight.
Thursday, July 18, 2013
Bathroom demo-prep
Tomorrow finally going to say goodbye to our gross upstairs bathroom. Getting the house ready for the mess.
Sunday, July 14, 2013
Thursday, July 4, 2013
Tuesday, July 2, 2013