Friday, September 27, 2013

Bathroom - Upper Cabinets

Upper cabinets got installed today. I need to fill mails holes and touchup the trim and get the faucet and lights installed and it will be finished. 



Thursday, September 26, 2013

Sunday, September 22, 2013

Bathroom Window - Putty

Thought I'd try to document the steps and time for each individual step of restoring windows. 10 days until baby's due date, zero chance I'll meet that deadline. 

Removing putty - key is letting the windows steam for 2 to 2 1/2 hours. Old putty should just slide out right out once its nice and soft, out back in if it's chalky. 

If your putting in a lot of elbow grease your liable to scratch the glass too. 

Total time = 1 hour of work time


Steam really lifts the paint, I prefer to not scrape it since the steam makes the wood susceptible to tearing

Steam box powered by wallpaper steamer

Thursday, September 19, 2013

Bathroom - Grout & Toilet

After two and half months we finally have an upstairs toilet





Tuesday, September 17, 2013

Bathroom - Wall Tile

Subway tile is up and vanity is set. Once the countertop is in then the chair rail can be installed, walls grouted, and uppers installed. 



Friday, September 13, 2013

Penny round tile

Progress!  Dura rock was installed on floor and tub surround. Today the penny round tile was installed along with the door and window casings.  Monday floor tile should be grouted and wall tile started. 






Sunday, September 8, 2013

Bathroom - Sheetrock

Sheetrock is up and done. Walls and ceiling are painted. Dura rock on floors and shower area along with tiling next week.