Prep work for a small patio next to the driveway.
Tamped with a jumping jack and then hand tamped after final grading.
Screeding the sand
Finally cutting in the pavers...way more work than I was expecting.
Prep work for a small patio next to the driveway.
Tamped with a jumping jack and then hand tamped after final grading.
Screeding the sand
Finally cutting in the pavers...way more work than I was expecting.
First full year of the new garden plots. Each plot is approximately 8x4 feet with a 2 foot path between.
Finally getting the pathways completed between the garden plots. Would really have liked to use decomposed granit, but it isn't available locally.
Instead we are using crushed limestone (class 5 gravel) overtop some geotext fabric to keep the gravel separated from the dirt. Total of 6 yards will be used.
Planted a Contoneaster hedge along the southern property line for some additional privacy. Should grow to be about 7-8 feet tall.
2ft by 4ft hole, 31 60# bags of concrete. Took about two weeks. Probably one of my more planned out projects. It's square, plumb and level, that usually doesn't happen. Kids have been enjoying it. Still need to lay some pavers along the driveway.