Floor heat was installed last week. Tiler started today. Drain was installed, shower floor was mudded and sloped, and the main floor was leveled. Tomorrow the shower floor will be waterproofed and the floor tile will be set sometime after that.
Subscribe to:
Post Comments (Atom)
No comments:
Post a Comment